Process

HOW A RIVERTON
PROJECT RUNS.

Five phases, one team, and a clear view of what happens next — from the first wall coming down to the final detail going in.

New timber partitions and taped drywall in a clean residential renovation

Five phases

ONE TEAM.
THE WHOLE WAY THROUGH.

01

Demolition

Controlled, clean removal. We protect what stays, document what we find, and leave a site that is ready to build on.

Selective kitchen demolition with exposed framing and protected floors

02

Construction

Framing, structural changes and new layouts — built to plan, inspected, and square before anything is covered.

New timber partitions and taped drywall in a clean residential renovation

03

Trades

Electrical, plumbing and HVAC scheduled by the same team that runs the build. No gaps between crews.

Neatly routed hot and cold water supplies, drain and electrical rough-in

04

Finishes

Drywall, tile, trim, paint and millwork. The details people notice, installed by people who care that they do.

Porcelain shower tile installation with even joints and protected surfaces

05

Interior Design

Materials, fixtures, lighting and layout decided alongside construction — so the finished room matches the plan.

Warm living room with oak built-ins, linen seating and a stone coffee table

What stays constant

One schedule.
One point of contact.

Before work starts you get a written scope, a phased schedule and a single project lead. That person stays with you through every phase below.

Each phase closes with a walkthrough, so decisions are made in the right order and nothing gets covered up before it is right.

Start here

LET’S BUILD IT RIGHT
FROM THE START.